Côte Ste-Catherine I, II, III

Location Ste-Catherine, Qc
Installed Capacity 11.7 MW
Commissioning I:1989 - II: 1993 - III: 1995

Project Côte Ste-Catherine I, II, III

Côte Sainte-Catherine Phase I is the second project undertaken by Hydromega. Located on the South Shore of Montreal, near the city of Sainte-Catherine, at the lock of the St. Lawrence Seaway. The Côte Sainte-Catherine power station is special because its production is higher in winter than in summer.

* This site was developed and produced by Hydromega Services inc. It is no longer owned by the company.